Lutterworth Bypass
Published: 01/12/2018 00:00 - Updated: 08/01/2020 - 16:24
We were appointed as permanent works designers for the entire bridge. This was developed in conjunction with the Contractor and resulted in an innovative Integral bridge design with no movement joints. Sheet piled abutment foundations carried vertical load, integral with composite plate girder bridge beams and deck.