NAB Tower
Published: 06/12/2018 00:00 - Updated: 08/01/2020 - 16:27
Acting as designers of both the permanent works and temporary works. The Contractor was charged with the challenge of reducing the height of the tower due to severe ongoing corrosion. We designed all replacement permanent works to the tower including the Helideck. We also dealt with all temporary works issues including the tower crane foundations and lateral restraints.