Norfolk Bridge
Published: 03/12/2018 00:00 - Updated: 08/01/2020 - 16:26
A pre-stressed 3-span bridge. This bridge was a replacement for the old trussed arch bridge. An innovative solution was devised using old temporary piers in the river allowing the lateral slide of the old bridge to act as a temporary crossing for traffic. The new bridge was then constructed on one embankment and incrementally launched. Full design of the permanent works and all temporary works including the launching nose.